Home > About Us > News > Latest News
 
Contact Us
Our Role & Organisation
Executive Team
Daily Activities
Working With Others
Careers
Board Of Directors
Board Members
Meetings & Minutes
News
Latest News
Archived News Releases
Procurement
Policy and Strategy
Forward Work Plan
Electronic Tenders
Awarded Contracts
Professional Services Register
Prequalification Register
Road Maintenance Contracts
Publications
Design Standards
Manuals & Guidelines
Plans & Programmes
Reports
Strategies & Policies
Bylaws
Looking for other content in this section?
Design work for Whangaparaoa Road upgrade begins
Last reviewed: 20/11/2012 11:31 a.m.

Media release: 20 November 2012​

Auckland Transport is moving to the detailed design stage for the upgrade of the 1.6km section of Whangaparaoa Road from Hibiscus Coast Highway to Red Beach Road. It has appointed GHD Consultants Ltd to carry out the design.

The proposed upgrade sees Whangaparaoa Road becoming a four-lane road by adding two lanes to the south of the existing road, alterations and additions to underground services such as stormwater and wastewater, and putting the power lines underground.

An assessment was completed last year, and the preferred option for widening the road was decided on following public displays in August 2011.

The 1.6km section of the road reached its capacity of 25,000 vehicle movements a day in 2009. The upgrade to Whangaparaoa Road is a priority because Penlink, the second access to the peninsula, is on hold for the foreseeable future.

Letters have been dropped off at homes and businesses where GHD need to access properties to carry out surveys to assist with the design work. A web page is being set up on this website.